I always wondered if anyone was using a Kintronics Kinstar system. Do they get out as well as before? After putting in the Kinstar they had to decrease day power from 1 KW to 900 watts and nighttime power from 68 watts to 37 watts. Why? Was the ground system at their old site really messed up and this one is so much better that they'd cover more area if they ran the same amount of power? They didn't move very far; a little over 2 kilometers.

There's a whole lot of top loading going on here. The system does eventually add up to a quarter wavelength (90 degrees electrical height) but 61.2 degrees of that is top loading. The dealbreaker for me is that even though the towers are a lot shorter there have to be four of them instead of one and they still have to have a traditional quarter wavelength ground system; 120 quarter wavelength (60 meters) copper wires spaced three degrees apart and 60 meters long. Their new site still occupies as much land as the old one.

I swiped some of this from the Engineering Statement:

https://fjallfoss.fcc.gov/prod/cdbs/forms/prod/getattachment_exh.cgi?exhibit_id=632436&formid=301&q_num=5000

----- Original Message ----- From: "Patrick Martin" <mwdxer@xxxxxxxxx> To: <mwoz@xxxxxxxxxxxxxxx>; <wienbob@xxxxxxx>; <BACONTI@xxxxxxx>; <gaylemt@xxxxxxxxxx>; <irca@xxxxxxxxxxxxxxxx>; <martinfoltz@xxxxxxx>; <martin.foltz@xxxxxxxxxx>; <am@xxxxxxxxxxx>; <hard-core-dx@xxxxxxxxxxxxx>; <showe@xxxxxxxxxxxxxx>
Sent: Monday, October 26, 2009 6:04 PM
Subject: [IRCA] New MW QSL (KCFM)


After having such a long dry spell, since May, I received MW QSL #3006
in todays mail.

1250    KCFM     OR, Florence, received very friendly letter in 6 days
for CD report.
from Jon Thompson-GM/Owner. Address: 4480 Highway 101, PO Box 20000,
Florence OR  97439.

The station moved to a new tower setup and dropped to 900 watts. They
are using a Kinstar system of 4 poles that are 70 feet tall, instead of
their 200 foot tower. "Kintronics recently got FCC approval on this
tower arrangement, but ours was the first commercial tower ever
constructed and tested."

73,

Patrick

Patrick Martin
KGED QSL Manager

_______________________________________________
IRCA mailing list
IRCA@xxxxxxxxxxxxxxxx
http://montreal.kotalampi.com/mailman/listinfo/irca

Opinions expressed in messages on this mailing list are those of the original contributors and do not necessarily reflect the opinion of the IRCA, its editors, publishing staff, or officers

For more information: http://www.ircaonline.org

To Post a message: irca@xxxxxxxxxxxxxxxx