Don't forget this is coming up this week. Read the details below in my original email message.
On Mon, Sep 9, 2019 at 12:42 AM Paul B. Walker, Jr. wrote: > At 12:01AM Pacific time Saturday September 14th going into SUNDAY night, > KKOH 780 Reno will completely drop their carrier for 5 minutes, completely > shutting off their transmitter. They need to run a test on something and > have to do it with the transmitter off. > > So give a shot.. Remember, Saturday the 14th into Sunday at 12:01am PACIFIC > > Paul > _._,_._,_ > > _ Hard-Core-DX mailing list Hard-Core-DX@hard-core-dx.com http://montreal.kotalampi.com/mailman/listinfo/hard-core-dx http://www.hard-core-dx.com/
|